Scotch Malt Whisky Society

Project background The Scotch Malt Whisky society located at 28 Queen Street, Edinburgh is part of The Glenmorangie Company. They had water damage to their existing Decorative ceiling within the Entrance Area and were about to undergo refurbishment work making new Reception Area. Approach Taken We were asked to provide a quotation to strip existing [...]

By | 2017-08-28T15:27:47+00:00 August 28th, 2017|Case Studies|0 Comments

Inverleith Place Development

Project background We were working to Skill Construction and asked to provided a service to supply and fit approx. 1000 metres of new Cornice and Restore various existing Decorative Cornices and Ceilings on site. We also provided over 5000m2 of plaster application to all of the developments ceilings and walls leaving a perfect finish for [...]

By | 2017-08-28T15:19:57+00:00 August 28th, 2017|Case Studies|0 Comments

White Stuff, George Street Edinburgh

Background We recently complete the new Flagship store for White Stuff in Edinburgh, working as a Sub Contractor for Thomas Johnstone Ltd. Located at 89 George Street, this prestigious building which since 1903 was home to the much loved Grays Of Edinburgh. We were required to carry out extensive restoration work to many of the [...]

By | 2017-08-28T15:12:44+00:00 August 28th, 2017|Case Studies|0 Comments

Duddingston Village Cornice Restoration

Project background We are regularly requested by our customers to restore their original Cornice prior to them Re decorating. The main reason for this request is more often than not due to an excessive build of paint created by years and years of painting resulting in the Original Cornice Enrichment’s losing their definition and beauty. [...]

By | 2017-08-28T15:09:49+00:00 August 28th, 2017|Case Studies|0 Comments

Amarone, Edinburgh

Project background A slice of Italy is now available within the ‘wow’ factor Amarone restaurant, situated in a former bank on the corner of George street and St. Andrews square. The grade A listed building was recently transformed from bank to beautiful Pizzeria. We were appointed by main contractor Dimension to carry out the plaster [...]

By | 2017-08-28T15:07:28+00:00 August 28th, 2017|Case Studies|0 Comments

Durham Place East

Project background We were part of the works involved in updating a 1930’s bungalow into an open plan modern living space. We worked along side other trades and were involved with supplying and fitting a cornice in the living/kitchen area as well as plastering the stairwell area and attic conversion upstairs. Approach Taken It was [...]

By | 2017-08-28T14:59:27+00:00 August 28th, 2017|Case Studies|0 Comments

Aberdeen City Centre Apartments

Project background The project was situated in Aberdeen’s city centre and was an incomplete development of luxury apartments due to the Contractor at the time of developing entering administration. As the local council planners then became involved a highly decorative ornate 19th century ceiling was uncovered, hidden within the newly constructed false ceilings. This required [...]

By | 2017-08-28T14:48:26+00:00 August 28th, 2017|Case Studies|0 Comments

Clarence Street

Project Background Our client Mr. Banks requested our advise and an estimate to replace a missing section of Cornice and also to plaster his walls and ceiling within the properties bathroom during renovation works. The property was located in a Georgian terraced area of Edinburgh’s new town. Approach taken Once our estimate had been submitted [...]

By | 2017-08-28T14:40:17+00:00 August 28th, 2017|Case Studies|0 Comments

Hamilton Hall

Project Background The building located in St Andrews is one of the most photographed buildings in world golf. It was most recently occupied as student residences, however the building was in a considerable state of disrepair, having seen a failed attempt to convert it, resulting in the structure being partly demolished and ‘open to the [...]